欢迎您访问:瑞昌明盛自动化设备有限公司,我司将竭诚为您服务!
Triconex 8105 I/O空槽板

主页 > 产品中心 > RELIANCE

Triconex 8105 I/O空槽板

类目:RELIANCE
型号:Triconex 8105 I/O空槽板
全国服务热线:15270269218
手机:15270269218
微信:15270269218
QQ:3136378118
Email:3136378118@qq.com

在线咨询
产品详情




 

 

在线咨询买家必读:

 

一、店铺所有价格均不是实价,如需了解产品价格,请联系在线客服。

二、现货付款当日发货;期货从付款日起开始计算时间,货期不含国内外节假日。

 

三、买家通过快递或物流签收货物后,若有异议,请在收到货物当天内提出。

 

1、下单前,买家需向卖家确认价格和货期;若买家单方面下单,则订单视为无效;

 

2、下单后,买家不得更改产品品牌,规格型号以及数量、单价等,因买家提供产品规格型号错误而造成错误订货的,卖家不负责更换货品、退货、退款等,也不承担因此造成的损失;

 

3、下单后,若无质量问题,不接受无理由退/换货、退款;

4、因此产品生产厂家停产、升级无3C、涨价、受限制造成无法订货,则订单取消,卖家不承担任何相关法律责任;

 

5、因自然天气、运输货运、政法政治原因等非卖方所能控制之客观因素导致货期延误,卖家不承担任何相关法律责任,由买卖双方协商订单是否依旧生效。

 

请各位买家知悉相关条款,如有异议,请咨询解决相关疑问!

Nowadays, there are many kinds of PLC used in industry. For the low-end PLC, the ladder diagram instruction is similar. For the middle and high-end machine, many programs are compiled in language. Useful ladder diagram must be annotated with Chinese symbols, otherwise it is very difficult to read. If you can understand the equipment technology or operation process before reading ladder diagram, it seems relatively simple. If we analyze the electrical faults, we usually use the reverse search method or the reverse deduction method, that is, according to the corresponding table of input and output, we can find the corresponding PLC output relay from the fault point, and start the reverse search to satisfy the logical relationship of its action. Experience shows that if one question is found, the problem can be eliminated. Since there are two or more problems with the equipment at the same time, there are not many.
5. PLC fault identification
Generally speaking, PLC is an extremely reliable equipment with low failure rate, but it can also be damaged due to external factors.
(1) A proximity switch with 220 V working power supply shares a 4-core cable with the two lead wires of its input PLC signal contact and the 220 V power line of the proximity switch. The proximity switch is damaged at one time. When the electrician replaced it, he mistakenly adjusted the zero line of the power supply and the common line of the input PLC, resulting in burning out three PLC input points during power transmission.
(2) The zero line row of the primary system power transformer was stopped due to corrosion, resulting in the plc220v power supply rising to 380V, which burned the power module at the bottom of the PLC, and the 380 / 220V isolation control transformer was added during the rectification.
(3) PLC output common terminal label 1L, 2L, etc., operation computer for acl1n indicates, + 24 V power supply for L + m indicates simple mistake for beginners or inexperienced. If l + m is taken as the 220 V power supply terminal by mistake, the plc24 V power supply will be burnt out in the moment of power transmission.
(4) According to the author's long experience, the probability of PLC, CPU and other hardware damage or software operation error is almost zero. If the PLC input point is not caused by the invasion of strong current, it will not be damaged. If the normally open point of PLC output relay is not the external load short circuit or unreasonable design, the load current exceeds the extra range, and the contact life is also very long. Therefore, we find the electrical fault point, the key point should be placed on the PLC peripheral electrical components, do not always doubt the PLC hardware or program, which is very important for the rapid repair of defective equipment, rapid recovery of production, so the author talked about the PLC control circuit electrical fault maintenance, the key point is not in the PLC itself, but the PLC control circuit in the peripheral electrical components.