我们这里有您急需的停产备件,
优势现货,询不到的,买不到的,请联系我们!
欢迎来电询价,我们将会给您满意的价格!
公司主营进口PLC模块,可编程控制器,伺服控制系统,和DCS备件等,
例如:ABB、AB、GE, Bently,FOXBORO. MOTOROLA. XYCOM.HONEYWELL.YASKAWA. SIEMENS. SCHNEIDER. REXROTH. YOKOGAWA .KUKA .OVATION .OMRON 等。
尊敬的顾客您好,为了更好的保障您的合法权益,购买前请仔细阅读以下内容:
1.由于市场波动频繁,本店所标价格,并非实价,请买家提前咨询后再拍,感谢支持!
2,本店所售商品均为正品现货,图片实物拍摄。分为全新原装、全新无包装,工程余货和二手四种货品。购买前请联系客服仔细核对货品、型号、数量。
3, 本店所售商品保证质量,全新无包装和二手商品签收三日质量出现问题均包退换,请放心购买。因买家自己弄错产品型号、参数或剪脚、上机、错误接入电源、错误安装、保管不当、人为损坏等除外。
4,本店所售商品国内顺丰包邮,国外运费自理。支持七天内有任何产品质量问题退换货,过期一切损失请自行承担。签收快件前,请先检查包裹内货物是否有:破损、缺少、货物型号和数量不对等,有问题请拒绝签收并及时与我们联系。签收后,一切损失请自行承担。
5,价格说明 并非原价,以询价为准。
Difference between DCs and PLC
Control processing capacity
We know that a PLC controller can often handle thousands of I / O points. DCS controller can only handle hundreds of I / O points. As far as the requirements of DCS are concerned, centralized control is not allowed. Controllers with too many I / O points are useless in practical application. DCS developers do not need to develop controllers with many I / O points. Their main focus is to provide the reliability and flexibility of the system. But PLC is not the same, as an independent flexible control device, with a point ability is very strong.
In people's impression, the operation speed of PLC is much faster than that of DCS. From a certain point of view, it is true that PLC has a high efficiency in logic operation. The execution time of 1K logic program is less than 1 millisecond, and its control cycle (taking Di input to do output as an example) can be controlled within 50 ms; DCS uses the same way to deal with logic operation and analog operation, and its control cycle is often more than 100 ms. When we use PID algorithm to compare, we can find that PLC performs a PID operation in a few milliseconds, while the t2550 controller of network6000 + DCs also needs one millisecond to solve a PID, which shows that PLC and DCs have the same actual calculation ability, and a certain type of DCS controller is even stronger. The difference of control cycle is mainly related to the scheduling design of controller. The new DCS controller has learned the design of large PLC, and its performance in control cycle has been greatly improved. Take t2550 controller of network6000 + DCs as an example. The controller can set four tasks with different priorities, and the minimum operation cycle can be set as 10ms. With high-speed I / O card, the control cycle can reach 15 ~ 20ms. The analog operation is set in other tasks with long cycle.
Data communication exchange
DCs has inherent advantages in this aspect. From the early development of DCS, network has become the core technology direction of DCS manufacturers. Redundancy technology and narrowband transmission technology are the earliest research and development or successful application of DCS manufacturers. PLC is mainly designed according to independent device, its "network" is actually serial communication.
The problem of PLC data communication exchange is mainly due to the fact that PLC has been developing as an independent device for a long time, and there is no system concept; And mainly used in small control system, the problem is not obvious, so the development is slow. At present, there are some large PLC in this aspect has been improved, but to achieve the level of DCS still needs a long process.